Chart business Area Architecture Revision 5




НазваниеChart business Area Architecture Revision 5
страница28/28
Дата конвертации15.02.2013
Размер0.67 Mb.
ТипДокументы
1   ...   20   21   22   23   24   25   26   27   28

14.2 Generate Release Plan


Once all the requirements have been allocated to releases and builds, the release contents were defined and could be summarized. The summarized CHART System Release Plan is shown on the figure below.





Figure 10.2-1 – CHART System Release Plan – Multi-Year Deployment Schedule


The CHART Organization Recommendations Plan, shown in the table below, represents changes that should happen at the organization and location level in parallel with the System Release Plan. Note that this is not a system or software release plan, and represents only suggested implementation of the requirement relative to the concurrent CHART System Release Plan Builds.


Figure 10.2-2 – CHART Organization Recommendations Plan


Rqmt #

Requirement

Suggested Concurrent with System Release

57. 

Identify dedicated CHART “ambassadors” to interface with key stakeholders on a regular basis

3

61.

Improve retention – implement explicit mentoring program for new HOTs

3

62.  

Improve retention – implement suggested minimum observation time in SOC as part of hiring process

3

63

Improve retention – implement round table interviews (vs. one-on-one)

3

64. 

Improve retention – evaluate feasibility of pilot program for different types of shifts

3

66.

Training – validate requirements for new/revised training programs and develop training development plan

3

67.

Training – develop and deliver Basic CHART training program (functional and application-based).

3

68.

Training – develop and deliver application-based training for Advanced Event Management and Special Event Management

3

70.

Staffing expansion – 3 operators per shift; especially when TOCs are closed

3

71. 

Staffing expansion – TOC 7

3

81.

Devices – increase coverage to less-populated areas

4

65.

Improve retention – identify and evaluate feasibility of non-monetary benefits (e.g., daycare)

4

69.

Training – develop and deliver application-based training for Reporting and System Administration

4

80.

Devices - increase number of locations by leveraging more privately or regionally owned device output (e.g., cameras, detectors, sensors)

4

82. 

Devices – increase coverage by re-using existing infrastructure for new devices (e.g., radio towers, old Whellan detector locations)

4

75.  

Facility, expansion – TOC 7

4

76. 

Facility, new – TOC 1, Eastern Shore

4

77.

Staffing expansion – TOC 6, Allegany County

4

78.

Facility, improved work space design at police barracks and district offices

4

79.

Field operations depot

4

58. 

Develop clear protocols for managing shared events and communicate them to operators and field responders for SOC, TOCs, and AOC.

4

59.

Develop improved working relationship and clear protocols with signal shop for adjusting signal timing and monitoring the effectiveness of signal adjustments during an event.

4

60.

Visibility into maintenance shop assets (equipment/vehicles)

5




1 POLDAT = CSC methodology acronym for Process, Organization, Location, Data, Application, and Technology

1   ...   20   21   22   23   24   25   26   27   28

Похожие:

Chart business Area Architecture Revision 5 iconRawls College of Business 2003-2008 Graduate Program Review Revision of April 27, 2007

Chart business Area Architecture Revision 5 iconAutodesk Revit Architecture. Часто задаваемые вопросы > Что представляет собой Revit Architecture?
Каким образом Revit Architecture 2009 помогает вести экологически рациональное проектирование?

Chart business Area Architecture Revision 5 iconThere is no mute architecture. All architects, all buildings "tell stories" with varying degrees of consciousness. Architecture is permeated with narratives

Chart business Area Architecture Revision 5 iconI. T. U. Faculty of Architecture Department of Architecture Building Technology Division

Chart business Area Architecture Revision 5 iconQty auction commences in mid carpeted area at at end of gallery area by Staff Canteen

Chart business Area Architecture Revision 5 iconInternational Business Environment: International business' an overview Concept of international business Classification of international business Factors

Chart business Area Architecture Revision 5 iconТеоретическая часть
Роль сетей Internet (Wide Area Network) Internet (Lokal Area Network) в создании компьютерных фирм 16

Chart business Area Architecture Revision 5 iconAnswers exercise 1: time chart

Chart business Area Architecture Revision 5 iconAhnentafel Chart for Ann Elizabeth lander

Chart business Area Architecture Revision 5 iconAhnentafel Chart for Vickie Lynn Huff


Разместите кнопку на своём сайте:
lib.convdocs.org


База данных защищена авторским правом ©lib.convdocs.org 2012
обратиться к администрации
lib.convdocs.org
Главная страница