Part III building Guidelines




Скачать 199.34 Kb.
НазваниеPart III building Guidelines
страница6/6
Дата конвертации04.02.2013
Размер199.34 Kb.
ТипДокументы
1   2   3   4   5   6

BUILDING PERMIT FEE SCHEDULES


The following permit fee schedules shall apply in all construction. The Community Development Director shall have the discretion and authority to deem buildings and or uses as Factory or Storage based upon the general descriptions provided in the International Building Code and in addition to the specific buildings and uses listed therein.


Table A. – Residential and Commercial Building Permit Fee Schedule


Building Permit Fee Schedule

Finished Building/Residential#, *

$ .60/ft2

Unfinished Building/Residential#

$ .30/ft2

Decks

$ 45.00

Outbuildings – Greater than 120ft2

$ 45.00

In-Ground Pools

$ 45.00

Above Ground Pools

$ 25.00

Fences

$ 25.00

Miscellaneous

$ 15.00

Demolition

$ 35.00

Grading

$100.00


#Garage area not included in calculating building square footage in residential construction

*Buildings or portions thereof that fall into either Use Category F – factory or S –storage shall be charged the unfinished rate.


Table B. – Mechanical Permit Fee Schedule


Mechanical Fees

Description of Work

Fee Schedule

Minimum/Origination Fee

$30.00

Rough Inspection

$10.00

Finish/Final Inspection

$10.00

Extra Inspections#

$25.00

Fixtures – Each

$ 5.00

Water Heater – Residential

$ 5.00

Water Heater – Commercial

$10.00

Boiler

$ 5.00

Furnace

$ 5.00

Forced Air

$ 5.00

Fireplace

$ 5.00

Air conditioner

$ 5.00

Ovens/Ranges

$ 5.00

Exhaust

$ 5.00

Heat Pump

$ 5.00


# Extra inspections would include multiple inspections after rejected inspection.


Table C. – Electrical Permit Fee Schedule Table D. – Plumbing Permit Fee Schedule





Electrical Fees

Description of Work

Fee Schedule

Minimum/Origination Fee

$30.00

Rough Inspection

$10.00

Finish/Final Inspection

$10.00

Extra Inspection#

$25.00

Appliances – Each

$10.00

Outlets – Each

$ .25

Circuits – Each

$ 2.00

Service up to 200 Amp

$15.00

Service over 200 Amp

$20.00

Service 400 to 600 Amp

$40.00

Service over 600 Amp

$75.00

New Service

$25.00

Plumbing Fees

Description of Work

Fee Schedule

Minimum/Origination Fee

$30.00

Ground Rough Inspection

$10.00

Rough Inspection

$10.00

Finish/Final Inspection

$10.00

Extra Inspections#

$25.00

Fixtures – Each

$ 10.00

Water Heaters – Residential

$ 5.00

Stack Replacement

$30.00

Sprinkler System##

$30.00

Septic System

$30.00

Backflow Devices

$2.00



# Extra inspections would include multiple inspections after rejected inspection

## Applies only to outdoor lawn sprinklers


















20

1   2   3   4   5   6

Похожие:

Part III building Guidelines iconPart III: The Political Use of the Myth

Part III building Guidelines iconM. Sc. (Physics) part-ii (III & IV semester)

Part III building Guidelines iconWeb ct guidelines for using Webct 27-30 Staff Contact Details Academic and Support Staff Contact Details 31-32 part one general information

Part III building Guidelines iconPrincipal Department for Transport, Energy and Infrastructure, Building Management Building the Education Revolution hotline: 82077144 introduction

Part III building Guidelines iconRemember: The Air France Concorde crashed into a hotel building after takeoff from Charles de Gaulle airport on 25 July 2000. Points to be noted here that building didn't collapse as in 911 in New York

Part III building Guidelines iconСписок литературы. Логика Арно А. Николь П. «Логика как искусство мыслить» П. Б. Струве «Логика для женской гимназии» Асмус В. Ф. «Логика» Москва 1947г. «Формальная логика» лгу 1977г
«Journal of symbolic logic» 1934г., VI part 4, XXVI part 1-2? 1960 г., V part 4-5, 1980г

Part III building Guidelines icon2003 international building code modified for the 2004 florida building code

Part III building Guidelines icon2003 international building code modified for the 2004 florida building code

Part III building Guidelines iconСтроительные нормы и правила сниП 03. 01-87 "Несущие и ограждающие конструкции" (утв постановлением Госстроя СССР от 4 декабря 1987 г. N 280) (с изменениями от 22 мая 2003 г.)
Взамен снип iii-15-76; сн 383-67; снип iii-16-80; сн 420-71; снип iii-18-75; снип iii-17-78; снип iii-19-76; сн 393-78

Part III building Guidelines iconRoe V. Wade (No. 70-18) 314 F. Supp. 1217, affirmed in part and reversed in part


Разместите кнопку на своём сайте:
lib.convdocs.org


База данных защищена авторским правом ©lib.convdocs.org 2012
обратиться к администрации
lib.convdocs.org
Главная страница