Part 1 GENERAL part 1 general description




Скачать 123.38 Kb.
НазваниеPart 1 GENERAL part 1 general description
страница5/14
Дата конвертации25.10.2012
Размер123.38 Kb.
ТипДокументы
1   2   3   4   5   6   7   8   9   ...   14

PART 2 PRODUCTS


PART 2 PRODUCTS
    1. FIRST AID FACILITIES

      1. Provide adequate facilities for the number of employees and the type of construction at the site.

    2. PERSONNEL PROTECTIVE EQUIPMENT

      1. Meet requirements of NIOSH and MSHA.

  1. PART 3 EXECUTION


PART 3 EXECUTIONS
    1. EMERGENCY INSTRUCTIONS

      1. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

    2. EGRESS

      1. Provide and maintain adequate egress at all times in accordance with the Life Safety Code (NFPA 101). No corridor, aisle, stairway, door, or exit shall be obstructed or used in a manner that interferes with egress.

    3. PROTECTIVE EQUIPMENT

      1. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

      2. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

    4. SAFETY MEETINGS

      1. As a minimum, conduct weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

      2. Conduct monthly safety meetings for all levels of supervision. Notify the Contracting Officer of meeting dates and times. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program. The Contracting Officer will attend the meeting and enter the results of the meetings into the daily log.

    5. HARD HATS AND PROTECTIVE EQUIPMENT AREAS

      1. A hard hat area will be designated by the Contracting Officer. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.

      2. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide six hard hats for use by visitors. Change liners before reissuing hats.

    6. TRAINING

      1. First Aid: Provide adequate training to ensure prompt and efficient first aid.

      2. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.




  1. PART 4 MEASUREMENT AND PAYMENT


END OF SECTION


SECTION 01570


TEMPORARY CONTROLS


  1. PART 1 GENERAL


PART 1 GENERAL
    1. DESCRIPTION

      1. The work of this section consists of providing temporary controls.

  1. PART 2 PRODUCTS Not used.


PART 2 PRODUCTS Not used.
  1. PART 3 EXECUTION


PART 3 EXECUTIONS
    1. HOUSEKEEPING

      1. Keep project neat, orderly, and in a safe condition at all times.

      2. Provide enough containers for collecting construction debris and construction materials to be recycled.

      3. Provide individually marked containers for recycling personal items, such as aluminum cans, newspapers, glass, plastic, corrugated cardboard. These items may be recycled by the Contractor or turned over to the Park recycling committee.

      4. Wet down dry materials and rubbish to prevent blowing dust.

      5. Keep volatile wastes in covered containers.

      6. Utilize excavated material as soon as possible.

1   2   3   4   5   6   7   8   9   ...   14

Похожие:

Part 1 GENERAL part 1 general description iconDrainage part 1: general

Part 1 GENERAL part 1 general description iconPart A. General and Academic Information I. General Information Business Address Home Address

Part 1 GENERAL part 1 general description iconPart 1 General 1 section Includes A. Design, supply, and installation of roof fall protection anchors

Part 1 GENERAL part 1 general description iconPart 1 General section Includes A. Design, supply, and installation of rigid-rail fall protection system

Part 1 GENERAL part 1 general description iconPart 1- general 1section includes a. Work of this Section consists of certified and sustainable hardwood and softwood timber, and includes but is not limited to the following

Part 1 GENERAL part 1 general description iconWeb ct guidelines for using Webct 27-30 Staff Contact Details Academic and Support Staff Contact Details 31-32 part one general information

Part 1 GENERAL part 1 general description iconСписок литературы. Логика Арно А. Николь П. «Логика как искусство мыслить» П. Б. Струве «Логика для женской гимназии» Асмус В. Ф. «Логика» Москва 1947г. «Формальная логика» лгу 1977г
«Journal of symbolic logic» 1934г., VI part 4, XXVI part 1-2? 1960 г., V part 4-5, 1980г

Part 1 GENERAL part 1 general description iconRoe V. Wade (No. 70-18) 314 F. Supp. 1217, affirmed in part and reversed in part

Part 1 GENERAL part 1 general description iconOrganic Chemistry”,3rd ed., part a (Chapter11) & part B.(Chapter1,2,5,6,7,12)(1993)

Part 1 GENERAL part 1 general description iconGeneral Description of Local Conditions Covering


Разместите кнопку на своём сайте:
lib.convdocs.org


База данных защищена авторским правом ©lib.convdocs.org 2012
обратиться к администрации
lib.convdocs.org
Главная страница