Federal/State/Local Permit and Process Requirements

Permit

Statutory Authority

Permit Required for Major Activity

State and Federal Regulatory Reference

Regulatory Agency

ENVIRONMENTAL PROCESSES

Cultural Resource Impact Review

National Historic Preservation Act, Sec. 106

1,2,6,7,8,9,10,13

36 CFR Part 800

State of Washington Office of Archaeology and Historic Preservation

Washington State Environmental Policy Act (SEPA)

RCW 43.21

All

WAC 197-11

Works in conjunction with NEPA

Endangered Species Impact Review

Endangered Species Act, Sec. 7; USC 1531 et seq.

----

----

Works in conjunction with Sections 404 and 10

WASHINGTON DEPARTMENT OF NATURAL RESOURCES PERMITS

Surface Mining Permit

RCW 78.44

2,6,7

WAC 332.18

WA Department of Natural Resources

Burning Permit

RCW 76.04

2,6,8,9,11,13

WAC 332.24

WA Department of Natural Resources

Easement to Use State Lands

N/A

6,8

N/A

WA Department of Natural Resources

Dumping Permit

RCW 76.04

1,2,7,11,12,13

N/A

WA Department of Natural Resources

Right-of-Way or Road Use

N/A

8

N/A

WA Department of Natural Resources

Permit to Temporarily Remove or Destroy Survey Monument

N/A

1,2,5,6,7,13

N/A

WA Department of Natural Resources

Special Motor Vehicle Permit

N/A

1,2

N/A

WA Department of Transportation Motor Carrier Services



Federal/State/Local Permit and Process Requirements

Permit

Statutory Authority

Permit Required for Major Activity

State and Federal Regulatory Reference

Regulatory Agency

CLALLAM COUNTY PERMITS

Zoning Conditional Use Permit

N/A

2,3,5,6,7,8,

9,10,11,12,13

N/A

Clallam County Department of Community Development

Critical Areas

N/A

2,3,5,7,8,9,

10,11,12,13

N/A

Clallam County Department of Community Development

Building Permits:

Demolition Permit

Drainage Permit

Utility Permits

Construction Permit

N/A

2,3,5,6,7,8,9,

10,11,12,13

N/A

Clallam County Department of Community Development

Road Approach Permit

N/A

Same as above

N/A

Clallam County Road Department

Right-of-Way Permit

N/A

2,5,6,7,9,10,

12,13

N/A

Clallam County road Department

MISCELLANEOUS PERMITS

Archaeological Excavation Permit

Executive Order 11593 (OAHP) RCW 27.44;

RCW 27.53

1,2,3,4,5,6,8,

9,10,11,12,13

WAC 25-48

State of Washington Office of Archaeology and Historic Preservation

Forest Practices Approval

Forest Practices Act RCW 76.09

2,9

WAC 222

WA Department of Natural Resources

RCRA Covers: Solid Waste, Hazardous Waste, and Underground Storage Tanks

Resource Conservation and Recovery Act (RCRA)

2

40 CFR, Parts 240-271

Washington State Department of Ecology

Underground Storage Tank (UST) Notification Requirement

RCW 90.76

2

40 CFR 280.22 WAC 173-360

Washington State Department of Ecology Underground Storage Tanks Division


OVERVIEW OF CONSTRUCTION SCHEDULE (SCAN)


WATER QUALITY PROTECTION CONSTRUCTION SCHEDULE (SCAN)


FLOOD PROTECTION CONSTRUCTION SCHEDULE (SCAN)


GLINES CANYON DAM DEMOLITION SCHEDULE Part 1 (SCAN)


GLINES CANYON DAM DEMOLITION SCHEDULE Part 2 (SCAN)


ELWHA DAM DEMOLITION SCHEDULE Part 1 (SCAN)


ELWHA DAM DEMOLITION SCHEDULE Part 2 (SCAN)
1   ...   48   49   50   51   52   53   54   55   56

Похожие:

Draft Environmental Impact Statement iconDraft environmental impact statement

Draft Environmental Impact Statement iconFinal Environmental Impact Statement

Draft Environmental Impact Statement iconDecision Regulation Impact Statement

Draft Environmental Impact Statement iconAn Environmental Impact Study of Paddy Cultivation within Katagamuwa Sanctuary

Draft Environmental Impact Statement iconImpact of environmental pollution on the preservation of archives and records: a ramp study

Draft Environmental Impact Statement iconEnvironmental impact report no. 97-2 (Continued From September 10, 2002 With Public Hearing Closed) (Parkside Estates)

Draft Environmental Impact Statement iconImpact of wind resources and environmental regulations to future generation portfolio and its capacity factor in ercot

Draft Environmental Impact Statement iconNew real time risk indicators to improve the efficiency, environmental impact and safety of air traffic management

Draft Environmental Impact Statement iconFinancial statements Income statement Balance sheet Statement of cash flows Statement of changes in equity Notes to and forming part of the financial report

Draft Environmental Impact Statement iconCoopAtStan-28w weds May 16 7: 00 pm Draft Only Draft Only Draft Only


Разместите кнопку на своём сайте:
lib.convdocs.org


База данных защищена авторским правом ©lib.convdocs.org 2012
обратиться к администрации
lib.convdocs.org
Главная страница